Case StudyPorts & MaritimeJanuary 2026

Large-Scale MVS Program – Indian Ports

A USD 1 Million, 5-year Multi-Vendor Support engagement across major ports in India — managing 4,500+ mission-critical production assets with 98% SLA compliance achieved in the first year.

Industry

Ports & Maritime

Region

India

Published

January 2026

Services

Multi-Vendor Support · Field Engineering · Parts Logistics

The Challenge

Why this engagement existed

India's major ports run continuously, and the production systems behind cargo handling, terminal operations, and logistics cannot afford downtime. A failure in a single mission-critical asset can ripple across an entire terminal.

Across these ports, 4,500+ production assets from many vendors needed reliable, SLA-bound support — backed by spare parts positioned close enough to meet stringent response windows.

The customer required a partner who could take on a large-scale, multi-year Multi-Vendor Support programme: auditing the full estate, meeting demanding SLAs from day one, and delivering complex on-site work — such as large battery replacements — within tightly defined timelines.

Challenge context

4,500+

Mission-critical assets managed

Our Solution

A multi-year MVS programme built for mission-critical ports

Solid Tech Global delivered a USD 1 Million, 5-year Multi-Vendor Support engagement across major Indian ports — combining a full asset audit, SLA-driven support, and on-site spare kits to keep 4,500+ mission-critical production assets running.

🔧

Multi-Vendor Support

Single-contract support across the ports' multi-OEM estate of 4,500+ mission-critical production assets.

📋

Full Asset Audit

A comprehensive audit of 4,500+ enterprise assets with detailed reporting and analysis to baseline the estate.

📦

On-Site Spare Kits

Spare kits positioned on-site at each port to meet stringent SLA response and resolution requirements.

🔋

Battery Deployment

Installation of 759 batteries completed within customer-defined timelines to protect critical power backup.

⏱️

SLA Compliance

SLA-bound delivery achieving 98% compliance within the first year of the engagement.

Programme Highlights

What we delivered

98% SLA Compliance (Year 1)
759 Batteries Installed On Time
On-Site Spare Kits
4,500+ Asset Audit
USD 1M · 5-Year Program
Mission-Critical Coverage

Engagement Process

How we executed

1

Asset Audit

Comprehensive audit of 4,500+ enterprise assets across major ports, with detailed reporting and analysis.

2

SLA Planning

Support tiers and spare-kit positioning designed to meet stringent, port-specific SLA requirements.

3

Spares & Battery Rollout

On-site spare kits staged and 759 batteries installed within customer-defined timelines.

4

Go Live

Full MVS coverage activated across all port sites under a single accountable programme.

5

Ongoing Delivery

Multi-year SLA-driven support with continuous reporting — 98% SLA compliance achieved in year one.

Measurable Outcomes

Results delivered

98%

SLA Compliance

Within the first year

759

Batteries Installed

On customer timelines

4,500+

Assets Managed

Mission-critical production

$1M

5-Year Program

Across major Indian ports

"

From the initial audit of 4,500+ assets to meeting our SLAs in the first year, Solid Tech Global proved they could operate at the scale and reliability our ports demand. The on-time battery rollout and on-site spares gave us real confidence in mission-critical uptime.

Programme Director

Programme Director

Major Port Operator, India

Continue Reading

Related Case Studies

Case StudyMarch 2026

BFSI & Industrial Power Sector Support – Across US

Read Case Study →

Ready to achieve similar results?

Talk to our team about your infrastructure challenges and we will show you exactly how we can help.

Get in Touch →Explore Services